Share
twitterlinkedinfacebook
Image 1 of 1
seattle.tunnel.machine_33.jpg
7/20/2013--Seattle, WA, USA<br />
<br />
"Big Bertha", the massive deep bore tunneling machine, will soon start escalating under Seattle building a 1.7 mile tunnel to replace the aging Alaskan Way Viaduct on Highway 99. The drill is the largest ever built and when finished with allow 4 lanes of traffic to bypass downtown Seattle.<br />
<br />
Here, workers with Seattle Tunnel Partners, do some last minute work before the machines starts boring it's way under Seattle.<br />
<br />
The $80 million dollar machine was built in Japan by Hitachi-Zosen and is 57 feet, 4 inches in diameter and 322 feet long.<br />
<br />
WSDOT plans to complete the $2 billion tunnel by late 2015 with funding from gas taxes and later, tolls.<br />
<br />
<br />
©2013 Stuart Isett. All rights reserved.